PROJECT
Replacing failed fusion bonded epoxy coating on piping
at a natural gas processing plant in Scotland
PROCESS
-
Surfaces preparation: St2-3
-
Pipework was then covered with STOPAQ Wrappingband and Outerwrap fully protecting the pipes from contact with water and oxygen, so preventing corrosion.
BEFORE
AFTER